Strasburg High School had a problem that many schools encounter over time: their existing gym floor desperately needed a facelift. Their main gymnasium floor had outdated graphics and the surface needed to be re-coated for longevity. As part of their update, Strasburg High School wanted tiger stripes painted in the keys of the basketball court, along the border, and a large block “S” at center court.
See details